Waterproofing terraces and roofs in Mallorca begins with identifying the source of the water ingress. At Construcciones Armalutx, we approach this as a construction company, not just as membrane applicators: we pinpoint the cause and repair everything necessary, from slopes and drains to insulation and paving.

Why Armalutx for waterproofing your terrace
First the cause, then the sheet
The stain on the ceiling is almost never directly below the point where the water is entering. We check drains, parapets, joints, and connections before suggesting anything, and if the dampness is coming from the facade or a pipe, we'll tell you.
The entire work, not just the print
If upon opening we find poorly made earrings, an unfinished breastplate or a broken support, we remake them in the same work, instead of sealing over them and making them disappear.
If water has damaged the floor slab
If it's been getting in for years and has damaged joists or reinforcement bars, we can reinforce it. This can be done with Mecanoviga (a steel profile placed under each joist and filled with mortar) or with whatever technique is required for the specific situation.
A manager who responds
A specialist roofer handles the waterproofing and is your point of contact, even when the terrace belongs to a community.
Why do terraces in Mallorca fail so often?
A terrace on the island can go from around 15°C in the early morning to over 60°C at midday in summer, and this constant fluctuation opens up joints and weakens the materials. On the beachfront, in Palma, Cala Ratjada, or Port de Pollença, the salt air attacks mortars and metal anchors. And in autumn, the torrential downpours arrive, bringing eighty liters of rain in just a couple of hours.
And then there's the design. Many apartment blocks from the 60s and 70s have a single drain for the entire terrace and no overflow. When that drain gets clogged with leaves or sand, the terrace becomes a pool, and the water finds its weak point. Today, the Building Code requires an overflow on a flat roof surrounded by a parapet that drains through a single downpipe.
Here we're talking about flat roofs and terraces. If yours is tiled, what you need is a roof renovation.
- Accessible terraces
- Flat roofs
- Community terraces
- About premises and garages
Which system is best suited to each terrace
There isn't one system that's inherently better than another. It depends on whether the terrace is walked on, whether the paving can be lifted, and how many intersections it has.
| Case | System | Because |
|---|---|---|
| Accessible terrace above the dwelling | Double-layer asphalt sheet under the pavement | Protected from the sun and wear, it is the most durable solution |
| Flat surface that doesn't get stepped on | Self-protected or PVC sheet, visible | Without paving on top: lighter and more economical |
| Terrace with many pillars, railings and drains | Continuous liquid membrane | Seamless: It handles corners and railing feet well. |
| Covered with little or no insulation | Sprayed polyurethane with its protective layer | Waterproofs and insulates in the same operation |
| Terrace above a premises or a garage | Reinforced asphalt sheet | A leak here could stop business downstairs |
We chose the system after seeing the terrace and the condition of its support.
What really makes a terrace watertight
The sheet rarely fails in the center of the panel. It fails at the edges, in the drains, and at the junctions, and that's where you can tell who did the work.
Slopes towards the drains
Between 1 and 5 % on a walkable terrace. Without a slope, the water pools and seeks out any crack.
Finishing touches on parapets and walls
The membrane extends at least 20 cm above the pavement along the parapet. It is finished with a groove or profile to prevent water running down the wall from seeping in behind it.
Drains and overflows
Each drain with its reinforcement piece and, if the terrace has a parapet and a single downpipe, its overflow.
Expansion joints
The pavement needs joints to move with the heat without dragging or breaking the sheet.
Elements that pass through the roof
Chimneys, antennas and anchors, at least 50 cm from the parapets and with a protection that rises 20 cm above the pavement.
Test before closing
Before laying the pavement, the watertightness of the membrane is checked, while it can still be corrected without lifting anything.
Repair or waterproof the whole thing: the signs
It is repaired when the fault is localized and the rest of the membrane is still usable. It is fully waterproofed when these signs appear.
Dampness in more than one spot on the ceiling below
The sheet fails in several places at once and a patch is not enough.
Hollow or bulging tiles when stepped on
Water is already flowing under the pavement.
Open joints around the drains
The most delicate encounter on the terrace has been conceded.
White efflorescence on the ceiling or parapet
These are salts that the water carries away as it passes through the mortar.
Stains that appear days after it rains
There is water trapped inside the slab. It's no longer just a localized leak: it's a reservoir.
More than twenty years since the last waterproofing
Even if there are no stains, it's worth checking it before the first heavy autumn rain.
Without lifting the floor
Waterproofing over pavement: when to do it and when not to.
It can be done with liquid membranes applied over the existing floor, provided the subfloor is firm and there is no water trapped underneath. It's faster and cheaper, but there's one non-negotiable condition: if the subfloor is soaked, sealing the surface will trap the water, and the problem will continue to spread from within.
That's why, before proposing it, we check the actual condition of the surface. If it's saturated, we recommend lifting it, letting it dry, and doing it properly. Dampness has more entry points than just the terrace, and we review them in the guide on... how to protect your house in Mallorca from damp.
- Firm pavement, without hollow pieces
- Forged without retained water
- Drains and joints cleaned before applying
How much does it cost to waterproof a terrace in Mallorca?
Between €20 and €50/m² in 2026, for waterproofing alone. The final price is mainly determined by the finishing touches: parapets, steps, pillars, and drains increase the cost more than the flat surface.
| Item | Guide price |
|---|---|
| SBS or APP asphalt sheet | 22-35 €/m² |
| Continuous liquid membrane | 25-45 €/m² |
| Sprayed polyurethane | 30-50 €/m² |
| PVC or TPO sheet | 30-45 €/m² |
| Demolition of existing pavement | 12-20 €/m² |
| New non-slip floor finish | 30-60 €/m² |
| Terrace of 40 m², waterproofing only | 800-2.000 € |
| 40 m² terrace with new paving | 2.500-5.000 € |
Prices are indicative, from 2026, and do not include VAT. The price of your terrace will be determined after viewing it and measuring its finishes.
How to waterproof a terrace and how long it takes
A terrace of about 40 m² can be completed in four or five working days if the paving doesn't need to be removed. If it's demolished, the subfloor is prepared, and new paving is laid, it takes two or three weeks.
Diagnosis
We look for the actual entry point of the water in drains, parapets, joints and junctions, and we look at the ceiling below to find out how long it has been coming in.
Detailed budget
In writing and item by item: demolition, support, slopes, sheet, finishing and pavement.
Demolition and sanitation
We lift the pavement, remove the old sheets, and repair the support. If the floor slab is damaged, it is reinforced before proceeding.
Slopes, insulation and sheeting
Slopes towards the drains, insulation, and membrane with its finishing touches at parapets, drains, and joints. Liquid membranes require curing time between coats, and this period cannot be accelerated.
Test and pavement
We checked that the membrane did not allow water to pass through and we laid the pavement with its expansion joints.
4-5 days without removing the pavement · 2-3 weeks with new pavement
Frequently asked questions about waterproofing in Mallorca
How much does it cost to waterproof a 40 m² terrace in Mallorca?
Waterproofing alone costs between €800 and €2,000, depending on the system. If the existing pavement needs to be removed and replaced, the total cost is around €2,500-€5,000. The price is significantly affected by the linear meters of finishing work: parapets, steps, pillars, and drains.
How long does waterproofing last?
It depends on the system and whether it's protected from the sun: a sheet under the pavement lasts longer than a visible membrane. In all cases, what makes it last is maintenance: fifteen minutes in spring and another fifteen in autumn to clean drains and check joints and edges. If you only follow one piece of advice, let it be to check the drain before the first heavy rain in October.
Is it possible to waterproof a terrace in winter in Mallorca?
Yes, with conditions. Liquid systems and polyurethane require a dry surface and temperatures above 5°C, which is common on the island even in January. The problem isn't the cold, it's the rain: if the surface doesn't dry, it can't be applied, and in winter the working windows are shorter.
Who pays for the waterproofing of a terrace in a homeowners' association?
As a general rule, the terrace that serves as the building's roof is a common element even if only one resident uses it, so the waterproofing that protects the roof structure is paid for by the community. Whoever uses it must use it properly, is responsible for its routine maintenance, and is liable if they cause any damage. The bylaws of each building may have specific details. If the terrace is included in a building-wide renovation, check the building and community rehabilitation.
What guarantee does waterproofing have?
A leak is a habitability defect, and for this type of defect, the Building Regulations Act, when applied to the construction, establishes a three-year warranty from the date of acceptance. The membrane also has its manufacturer's warranty, which requires proper installation and maintenance of the terrace.
Do I need permission from the town hall to waterproof the terrace?
Normally, prior notification to the town hall is sufficient if the waterproofing doesn't affect the structure. If the floor slab needs to be rebuilt, or if the building is listed, a building permit is required. After seeing your terrace, we can tell you which procedure applies to your project and what documents are needed.
When is it not advisable to waterproof the terrace?
When the dampness comes from the facade or a pipe and not from above: sealing the terrace won't change anything. When the floor slab is soaked and there's a rush to close it up, because the problem will return. And when the entire building is going to be renovated next year: wait and do it all at once, since scaffolding and finishing work can be reused.
You might also be interested in
- Roof renovation and repairIf the roof is pitched and tiled.
- Building and community rehabilitationFacade, roof and structure of the building in a single work.
- Façade rehabilitationWhen moisture enters through the wall.
- Works of the IEE (formerly ITE)The roof repairs that are requested in an unfavorable report.
- How to tame salty humidity near the seaSaltpeter, mortars and metals in the houses on the coast.
Budget
Stains on the ceiling or a terrace that hasn't been touched in years?
The first step is to find out where the water is actually coming in. We'll check it and give you a quote with the cause explained. For urgent leaks, call 625 16 47 18.