Kitchen renovation in Mallorca

We carry out kitchen renovations in Mallorca, handling all the work that a kitchen store doesn't: partitions, plumbing, electrical work, and ventilation. At Construcciones Armalutx, we also open up kitchens to the living room, even if the wall is load-bearing, with its beam and permit, and we install the cabinets using new installations.

Finished kitchen in a newly built home

Why Armalutx for your kitchen renovation

  1. We opened the kitchen to the living room, which also has a load-bearing wall.

    We check if the wall is load-bearing, and if it is, we shore it up and install the beam calculated by the engineer. It's structural work, and we handle it ourselves: you don't need another company for the beam.

  2. New installations behind the furniture

    Before installing anything, we check for things you can't see: lead or iron pipes, old drains, or an electrical panel that can't handle the oven and cooktop at the same time. We replace it because that's what prevents the new kitchen from having problems after a year.

  3. Smoke, outside the house

    The range hood needs its own duct to vent the air outside, to a patio, or to the roof. Opening that duct is a construction project, and in an open-plan kitchen, it makes all the difference between a pleasant living space and one that smells like cooking.

  4. Kitchens in historic homes

    Exposed beams, stone or marès walls and high ceilings: our master stone and wood craftsmen recover them and fit the new kitchen without the house losing its character.

Renovating a kitchen is a construction project, not just furniture.

A proper kitchen renovation in Mallorca isn't just about replacing a few cabinets: it's about lifting the floors, relocating plumbing and electrical wiring, knocking down a partition wall if necessary, and creating a truly new space. You choose the cabinetry, with our advice; the surrounding work is what determines the kitchen's longevity, and that's the job of a construction company.

From Inca, throughout Mallorca, each trade is headed by a specialist supervisor and a single person coordinates the work, as in our full renovations in Mallorca. If you also renovate the bathroom, we'll add it to the bathroom renovation.

  • Load-bearing wall: calculated beam and permit
  • New plumbing and electrical work
  • Extraction with external outlet
  • Kitchens in stone and marès houses

What does a complete kitchen renovation include?

We completely redesign the space from scratch. A complete kitchen renovation involves:

  • Demolition

    Out with the old furniture, tiling and flooring, and the rubble removed from the construction.

  • Plumbing and drainage

    New outlets for sink, dishwasher and washing machine, wherever they will be in the new kitchen.

  • Electricity

    Separate circuits for oven, hob and appliances, sockets above the worktop and, if necessary, a new electrical panel.

  • Masonry and cladding

    Partitions, work front and floor leveled, ready to receive the furniture.

  • Extraction

    The duct from the hood to the outside and the ventilation that the kitchen needs.

  • Furniture, countertops and appliances

    We help you choose them and place them at the end, once the work is finished.

Open the kitchen to the living room

The kitchen is open to the living room, and the construction work was done well.

Opening up the kitchen to the living room is one of the most requested renovations, and it involves a lot of construction work. First, we check if the wall is load-bearing. If it is, we shore it up, install a beam or lintel to distribute the weight, and only then can we create the opening. A partition wall is usually demolished after prior notification. A load-bearing wall affects the structure: it requires a building permit with plans and, in an apartment building, the approval of three-fifths of the homeowners' association, because the structure belongs to everyone.

You gain light, spaciousness, and a kitchen that's more inviting to socialize. On the other hand, smells and noise can reach the living room, and you lose a wall of cabinet space: that's why the extraction system and the placement of each appliance are decided before anything is removed. If you're considering an island, we'll tell you more. what material to choose for a kitchen island.

  • Checking if the wall is load-bearing
  • Beam or lintel calculated by a technician
  • Shoring, beam and opening of the hole
  • License and, in one apartment, community agreement
  • Flooring, ceiling and installations redone throughout the space
Open kitchen to living room in a new build home

Phases of a kitchen renovation

This is how we organize each kitchen task, so that no job waits for another:

  1. Technical visit

    We measure, we look at the installations and if there are load-bearing walls, and you tell us how you use the kitchen.

  2. Budget and permit

    Detailed budget, item by item and in writing; then, the prior notification or the license.

  3. Demolition

    We dismantled the old kitchen and, if it opens onto the living room, we shored it up, placed the beam and opened the opening.

  4. Facilities

    Water, drainage, electricity and extraction, already at the new distribution site.

  5. Walls and floor

    Masonry, tiling and flooring, with continuous flooring if the kitchen is joined to the living room.

  6. Mounting

    Furniture and countertop plumb and level, and appliances connected.

  7. Delivery

    Finishing touches, cleaning and checking every detail with you present.

How much does it cost to renovate a kitchen in Mallorca?

The price depends on the square footage, the interior modifications needed, and the cabinetry you choose, and we'll give you a quote after we've seen the kitchen. What motivates him most:

  • Furniture and countertop

    This is the item that varies the most: from laminated furniture to lacquered or wooden furniture, and from a compact countertop to one made of natural stone.

  • Change the distribution

    Moving the sink or hob to another wall involves new connections, drains, and circuits.

  • Open to the living room

    Tearing down a partition wall is one thing; opening up a load-bearing wall, with a beam, calculations and a permit, is something else entirely.

  • Condition of the facilities

    If the electrical wiring or plumbing in the house is old, the kitchen is the perfect place to replace it.

  • Transportation to the island

    Stone countertops and large appliances arrive by boat, and in Mallorca that's reflected in the price.

  • VAT

    The fee is 10 % if the kitchen is for your own home, you order it as a private individual, the house is more than two years old, and the materials do not exceed 40 % of the total cost. Otherwise, the fee is 21 %. The municipal building permit fee and tax are separate.

Our kitchens in Palma apartments

  • Old Town of Palma

    Apartment from 1958

    75 m²18 weeks (entire floor)

    Open kitchen to the living room in a 1958 apartment where all the installations were changed.

  • Santa Catalina, Palma

    Penthouse

    65 m²+ 30 terrace14 weeks (the entire attic)

    Kitchen with island in the center of an open floor plan, within the comprehensive renovation of the penthouse.

Frequently asked questions about kitchen renovations in Mallorca

Do I need a permit to renovate the kitchen?

No, unless you're altering the structure: changing furniture, fixtures, or wall coverings requires prior notification, and in Palma, work can begin the next day. If you're moving partition walls, in Palma, the notification must be signed by a qualified professional, and you have to wait 15 days. Opening up a load-bearing wall does require a building permit with a project plan, and in an apartment, the approval of the homeowners' association. Before starting, we submit all the necessary documentation.

How long does a kitchen renovation take?

It depends on the scope: renovating a kitchen in place is not the same as opening it up to the living room with a new beam. What lengthens the project the most is waiting for custom-made cabinets or countertops and, if there's a load-bearing wall, the permit. With the estimate, we provide a timeline and order materials in advance so the work doesn't stop.

Can the house be used during the kitchen renovation?

Yes. You can continue living at home, although your kitchen won't be operational for a few days. We'll protect the rest of your home from dust, organize the work in phases, clean daily, and coordinate water and electricity shutoffs with you to minimize disruption.

What type of ventilation does an open-plan kitchen/living room need?

A range hood connected to its own vent to the outside, separate from the ventilation of the rest of the house and sized for the space. Where the vent exits—through the facade, patio, or roof—is determined by each building, and it's one of the first things we look at during the visit.

Budget

Shall we open your kitchen?

Write to us on WhatsApp at 625 16 47 18 and tell us how you want your kitchen. We'll come and see it, check the walls, installations, and ventilation, and tell you what work is needed.