Rehabilitation · Tile roofs and coverings
Roof renovation and repair in Mallorca
We renovate and repair roofs in Mallorca, starting with the supporting structure. Leaks, loose tiles, uninsulated roofs, or sagging beams: at Construcciones Armalutx, our master woodworkers repair or rebuild the beams. Then we replace the traditional clay tiles on a waterproof and insulated roof.

Why Armalutx for your roof
First, the structure
Before discussing roof tiles, we need to look at what supports them: beams, beam ends embedded in the wall, sheathing, and supports. If that fails, simply replacing the tile will only postpone the problem for a couple of winters.
Beams and eaves, in the hands of artisans
Our master wood craftsmen repair, restore or replace beams and eaves using traditional Mallorcan techniques, without turning a traditional roof into a catalog-quality one.
If a beam can't hold, we reinforce it here.
We installed Mecanoviga, a steel profile placed under the wooden beam and filled with mortar. We handled the structure ourselves, without waiting for another company with the roof exposed.
A tire technician in charge
Your roof is overseen by a specialist roofer, just like every trade on our projects. They're your point of contact from the initial visit to the final touches.
Why do roofs suffer so much in Mallorca?
Direct sun almost all year round, sea salt on the coast, the Tramuntana wind pushing against the roof tiles, and autumn rains that dump in two hours what falls in other areas in a month. The roof bears the brunt of it all and is the part of the house that gets the least attention: when the first stain appears on the bedroom ceiling, the problem has been building up above for years.
In old houses, the weak point is almost never the roof tiles. It's the ends of the beams embedded in the wall, which rot from the damp. And the junctions with chimneys, walls, and valleys (where two roof slopes meet), are where the water really gets in. If your roof is flat or the dampness is coming from a terrace, then your problem is the Waterproofing of terraces and roofs.
- Re-roofing or complete renovation
- Reclaimed or new beams
- Hand-recovered Arabic tile
- Underlayment and insulation
What does a complete roof renovation include?
Dismantle, inspect the structure, waterproof, insulate and re-tile, with the finishing touches that determine whether the roof is durable or leaks again.
Dismantling and storage of the roof tiles
By hand, removing the tile that can be recovered: in an old house, it is what gives it character.
Review and reinforcement of the structure
Beams, beam ends, deck, and supports. Sound components remain; damaged components are repaired, reinforced, or replaced. If further work is required, we address it with a structural reinforcement.
Firm supports on stone walls
When the wall does not provide continuous support, the new roof rests on a crowning ring that distributes the load and ties the walls together.
Waterproofing under tiles
The membrane should be properly overlapped over the board. A curved tile roof with a slope of less than 32 % cannot rely solely on the tile for water drainage: the membrane is mandatory.
Thermal insulation
The most noticeable loss occurs in summer. An uninsulated top floor is an oven in August and a refrigerator in January.
Tile placement
The old tile goes on top, in the visible coverings, and the new one below, in the hidden channels, welcome so that the tramontana wind doesn't move it.
Trims, gutters and downpipes
Ridges, valleys, eaves, and junctions with walls and chimneys. At the junction with a wall, the protection extends at least 25 cm above the roof.
Waste and cleaning
Debris to an authorized manager and the house cleaned upon completion.
To re-roof or rehabilitate the entire roof
Not all roofs need a complete overhaul. These are the signs that separate a simple repair from a full renovation.
| What you see | What does it usually mean | What's next? |
|---|---|---|
| Two or three roof tiles broken or moved after a storm | Localized wear with a healthy structure | Repair or re-roofing of that area |
| A leak in one spot | A finishing element has failed: valley, chimney, or junction with the wall | Localized repair of the intersection |
| Damp patches in various spots on the ceiling of the top floor | The waterproofing is exhausted | Roof rehabilitation |
| Beams with sag, softwood or sawdust | Rot, woodworm or termites | Diagnosis of the structure and reinforcement or replacement |
| A top floor that's impossible to cool in summer | Uninsulated roof | Rehabilitation with isolation |
| Overflowing gutters and water running down the facade | Clogged or undersized gutters for the roof | New gutters and downpipes |
| More than 50 years without touching the deck | Sheet metal and mortars at the end of their life | Complete pre-winter check-up |
This is a guideline. What you need in your house will be decided after going up on deck and, if necessary, opening a tasting.
Mallorcan work
Arabic tiles and wooden beams, as they were made
In village houses, traditional farmhouses, and historic town centers, the Arabic roof tiles and traditional eaves are part of the building's character, and in listed buildings, the local council often requires their preservation. This can be done properly: the old tiles are removed by hand, cleaned, selected piece by piece, and then reapplied to the exposed surface of a new, waterproof, and insulated roof.
The same principle applies to the beams: we salvage those that are sound, replace those that are not, and rebuild the eaves when necessary. Before deciding, it's helpful to know... how to detect if wooden beams are damaged, because it changes the work from top to bottom.
- Recovered tile on the visible face
- Beams repaired, reinforced or new
- Traditional eaves rebuilt
- Compliant with the regulations of the historic center

How much does it cost to renovate a roof in Mallorca?
2026 indicative price ranges per lot. The price of your roof depends on access, scaffolding, the condition of the structure, and how many tiles can be salvaged.
| Work | Guide price |
|---|---|
| Re-roofing: lifting and replacing the tile | 20-40 €/m² |
| Spot repair of a leak | From €300 |
| Partial roof rehabilitation | 50-100 €/m² |
| Complete replacement with insulation | 90-150 €/m² |
| Removal of asbestos cement roofing | 8-25 €/m², separate |
Figures from 2026, excluding VAT and indicative: we'll give you the figure for your roof after we go up and see it.
License and asbestos: what you should know before opening the roof
The permit depends on the scope of the work. And if the roof is made of asbestos cement, there is a mandatory preliminary step.
Re-roof or repair without touching the structure
Usually, prior notification to the city council is sufficient. In Palma, however, if the work alters the exterior of the building, prior notification requires a technical expert, and a 15-day waiting period is necessary before work can begin.
Change beams, slope or height
If the work affects the load-bearing structure or the volume of the building, in the Balearic Islands it cannot be processed with prior notification: an urban planning license is required, with the project of a technician.
Listed houses and historic centers
In a listed building, any work requires a permit, and the heritage report can specify the type and color of the roof tiles. In Palma, it first goes through the Historic Center and Catalogue Commission, which only meets two Tuesdays a month: keep that in mind.
Asbestos cement prior to 2002
It most likely contains asbestos. Only a company registered with the Asbestos Risk Companies Registry (RERA) can remove it, and they must have a work plan approved by the labor authority before starting. The authority has up to 45 days to approve the plan, so it's best to apply well in advance.
How we work on your roof and how long it takes
A single-family home can usually be completed in one to three weeks. If the structure needs to be replaced or the building is protected, it takes four to eight weeks.
Visit and diagnosis
We go up to the roof, look at the structure from the inside and, if necessary, open a test pit to see the condition of the beams.
Detailed budget
Item by item and in writing before starting: tile, structure, sheeting, insulation and finishing touches, so you know what you are paying for and what to expect.
Permits
Prior communication or license with the technician, and the asbestos work plan if the roof is made of asbestos cement.
Construction site
Dismantling, structure, membrane, insulation, and tiles. Whenever possible, roofs are opened between May and October: opening a roof during the peak of the cold snap season is a risk we prefer not to take with your house.
1-3 weeks in a single-family home
Auctions and delivery
Gutters, downpipes, ridge tiles and final cleaning, with the roof checked before it is considered finished.
Frequently asked questions about roofs in Mallorca
How much does it cost to fix a leaky roof in Mallorca?
A minor repair starts at around €300: locating the entry point, replacing the affected tiles, and sealing the joint. The price increases if access is difficult or scaffolding is required. And if the overall waterproofing is worn out, fixing that leak won't solve the problem: another one will appear.
Can old Arabic roof tiles be reused when renovating a roof?
Yes, and in historic city centers and protected buildings, it's usually mandatory to keep it on the exposed face. It's removed by hand, cleaned, sorted, and reinstalled over the new membrane and insulation. Broken pieces are replaced with aged, reclaimed tiles so the change isn't noticeable.
Is it possible to insulate a roof without lifting the tiles?
Yes, you can insulate from the inside, with panels or spray-applied insulation under the roof slab, and it's cheaper. But it's less effective and doesn't fix the waterproofing, which is usually the underlying problem with an old roof. If the roof already needs repairs, it's worth insulating from the outside at the same time.
What guarantee does a roof renovation have?
The warranty period is determined by law, if the construction falls under the Building Regulations Act (LOE). The builder is responsible from the date of acceptance: one year for finishes, three years for issues affecting habitability, such as leaks, and ten years for the structure. The waterproof membrane also carries its manufacturer's warranty.
Are there any grants available for roof renovations in the Balearic Islands?
Open grants? No: Next Generation closed its applications on June 30, 2025. The personal income tax deduction remains, as explained in the guide. grants for home renovations in the Balearic Islands. If insulating the roof of your main residence reduces its heating and cooling demand by at least 7%, you can deduct 20% from your energy payments up to December 31, 2026. The maximum deduction is €5,000 per year. A prior energy performance certificate and a subsequent one, issued before January 1, 2027, are required.
How long does it take to renovate a roof?
Between one and three weeks for a single-family home, and four to eight weeks if the structure needs replacing or the building is listed. The biggest factor in determining the timeframe isn't the size, but the weather: a roof can't be opened in the rain.
When is it not advisable to renovate the roof?
When dampness from the top floor enters through the facade or a gutter, not the roof, a proper diagnosis saves an entire renovation. When you're planning to add height in less than two years, because rebuilding a roof you're going to demolish is a waste of money. And when there are only two or three broken tiles, it's just maintenance, not a major repair. We'll tell you this even if it means lower billing.
You might also be interested in
- Waterproofing of terraces and roofsWhether the roof is flat or the moisture is coming from a terrace.
- Rehabilitation of traditional farmhouses and estatesThe entire house: stone, marès, beams and tile roofs.
- Structural reinforcementBeams and slabs that can no longer withstand the load: Mecanoviga and other techniques.
- Façade rehabilitationWhen water enters through the wall and not from above.
- Damaged wooden beams: how to detect itRot, woodworm and termites: the signs before opening the roof.
Budget
Tell us what's wrong with your roof
Leaky roofs, loose tiles, or a top floor that's impossible to heat or cool: we'll come up and see for ourselves, explaining what really needs to be done and in what order. If the leak can't wait, call us or send us a WhatsApp message at +34 625 16 47 18 and tell us where the house is located.
- 625 16 47 18
- info@armalutx.com
- Monday to Friday, from 8:30 a.m. to 4:00 p.m.
- Carrer del General Weyler, 29 · 07300 Inca, Mallorca