Skip to content

New construction · Swimming pools

Construction of in-ground swimming pools in Mallorca

At Armalutx Construction, we treat swimming pool construction in Mallorca as just another home improvement project: from the structurally engineered reinforced concrete pool shell to obtaining the necessary permits and stone coping. We can build it under the same contract as your home or on an existing one, and we also renovate concrete pools that are leaking or have cracks.

Built-in swimming pool with ceramic coping in a villa in Sa Pobla

Why build your pool with a construction company?

  1. A swimming pool is a structure

    The pool is a reinforced concrete structure that withstands the pressure of the water and the surrounding soil. It's designed by a technician and we build it like any other structure in a house: rebar, concrete, and the necessary curing time.

  2. With the house, in the same contract

    If we build your house, the swimming pool is included in the same project and permit. A single person is responsible for the entire construction, with a supervisor in charge of each trade.

  3. Stone walls and crowning

    On plots with slopes we build the retaining walls that support the pool, and the crowning, the walls and the stone or marès paths are made by our master craftsmen.

  4. Also the one you already have

    We rehabilitate concrete swimming pools that are leaking or have cracks: diagnosis of the pool shell, repair, waterproofing and new lining.

The swimming pool, built by the house's construction company

A custom-built swimming pool is a reinforced concrete basin, usually gunite, excavated in the ground and waterproofed, including its lining, filtration system, and coping. As a swimming pool construction company in Mallorca, we handle everything from start to finish: excavation, basin construction, waterproofing, installations, and stonework, without dividing the work among several companies.

We don't mass-produce pools. Each one is designed with your specific needs in mind, taking into account the amount of sunlight on your property and the surrounding house. It could be for your main residence, a country estate, or a rental villa.

  • Reinforced concrete vessel
  • License and structure included
  • Stone or marès crowning
  • Rehabilitation of concrete swimming pools

Custom-built swimming pools that we construct

  • New construction swimming pools

    For your house, a farm or a holiday rental villa: rectangular, overflowing, with a sandy beach or heated, always with a concrete basin.

  • Designer swimming pools

    Custom shapes, natural stone on edges and beaches, and finishes that follow the architecture of the house.

  • Swimming pools on plots with a slope

    With the retaining walls and foundation calculated so that the basin does not move.

  • Swimming pool renovations

    We renovate pool basins, linings and installations that have become outdated or are leaking water.

  • Debugging and automation

    Salt chlorination, low-consumption pumps, lighting and mobile control, installed with the work.

How we build a concrete swimming pool

Each pool follows the same order, and there is no rush: the curing of the concrete and the waterproofing sets the pace.

  1. Visit and proposal

    We assess the terrain, machinery access, and sun exposure, and you tell us how you'll use the pool. Based on that information, we'll propose dimensions, shape, and finishes.

  2. Project and license

    The pool requires excavation, and in the Balearic Islands, earthworks always require a building permit, never just a simple notification. We'll prepare the documentation with the technician and guide you through the process.

    License: maximum legal term of 3 months

  3. Excavation and vessel

    We excavate, assemble the basin with its rebar and project the concrete, with the retaining walls required by the plot.

  4. Waterproofing and coating

    We waterproof the pool and place the lining of your choice: mosaic tiles, natural stone, microcement or reinforced membrane.

  5. Installation, crowning and filling

    We install the purification, lighting and chlorination, place the stone or marès coping and fill the pool, which we do not hand over to you until we check that it does not leak water.

    Construction: 4-8 weeks

New construction

House and pool in the same contract

When we build your house, the swimming pool is part of the project from the very beginning. We decide its level relative to the porch, the routing of the plumbing and electrical systems, and where the pump room is hidden. Excavation then takes place once the machinery is already on site.

This way, there aren't two companies overlapping on the project, nor is a pool left unfinished, forcing them to tear up the newly landscaped garden. If you're just starting out, see how we work. new construction and what does a villa with pool.

  • Pool level designed to match the level of the house
  • Facilities and technical room planned in the project
  • One excavation and one site manager
  • Walls, paths and crowning to match the facade
Rectangular swimming pool in front of a stone villa

Renovation and rehabilitation of concrete swimming pools

If your pool is leaking, has cracks, or the tiles are coming loose, the waterproofing has failed and the problem will only get worse. Rehabilitating it is usually more cost-effective than building a new one, provided the structure can withstand the strain.

  1. Diagnosis of the vessel

    We drain and clean the pool to see the actual concrete: cracks, leaks, joints, and areas with exposed rebar. If the leak is localized, it can sometimes be repaired without draining the pool.

  2. Cracks and armor

    We clean and repair with mortars that withstand constant contact with water and, if necessary, we reinforce them. Simply stitching a crack with staples and sealing it over the top is useless: it will reopen with the next movement of the ground.

  3. Waterproofing and new coating

    Cementitious membrane or coating and, on top, mosaic tiles, microcement or reinforced sheet, respecting the drying of each layer: a poorly cured waterproofing will fail again in a season.

  4. Filling and testing

    We filled it, adjusted the filtration, and checked for a few days that the water level remained constant.

Frequently asked questions about building swimming pools in Mallorca

What license do I need to build a swimming pool in Mallorca?

A building permit from the town hall is required. The swimming pool involves excavation, and Balearic law does not allow earthworks to be processed with prior notification. Furthermore, the ICIO (Construction, Installations and Works Tax) is payable, which each municipality sets on the cost of the work up to a maximum of 4.1% of the total cost. When the pool is built at the same time as the house, it is included in the same project and the same permit.

How long does it take to build a concrete swimming pool?

The project typically takes between four and eight weeks, from excavation to filling, not including the permitting time. The timeframe depends on the size of the pool, the terrain, the curing time of the concrete and waterproofing, and the weather: gunite and waterproofing cannot be applied in the rain. If you want to swim in the summer, it's best to start in the fall or winter.

How much does it cost to build a concrete swimming pool in Mallorca?

It depends on the size, shape, terrain, lining, and any additions: climate control, lighting, a waterfall, or automation. In Mallorca, shallow rock and machinery access are significant factors, which is why we can't provide a price without seeing the site. You can find indicative price ranges at [link/website/etc.]. How much does it cost to build a concrete swimming pool?.

Which lasts longer, a built-in pool or a prefabricated one?

The built-in option. The reinforced concrete shell is a single piece, better withstands ground movement, and can accommodate any shape, size, and depth. The prefabricated option is quicker and cheaper to install, but is limited to catalog sizes. Properly waterproofed, a concrete pool can last for many years without needing major maintenance.

Can I build a swimming pool on a rural property?

Yes, as an addition to a house that the planning regulations allow, but with limitations. Only one swimming pool per property is permitted, with a maximum water surface area of 35 m² and a volume of no more than 60 m³. Before designing it, we check with the technician what the municipality's general plan allows for that plot.

When is it worthwhile to build a new pool instead of renovating an existing one?

In three cases. When the pool shell is so cracked that the only reliable solution is to gunite the entire structure, because then it costs almost as much as a new pool. When the ground has settled and reinforcing it doesn't guarantee stability. And when you want a different shape, depth, or location. In all other cases, renovation is usually more cost-effective.

Why is a concrete swimming pool leaking if there are no visible cracks?

Leaks can be caused by micro-cracks in the pool shell, deteriorated seals, or faults in the pipes and skimmers. A leak test pinpoints the exact location of the leak, and with that information, we decide whether a localized repair is sufficient or if the entire pool shell needs to be waterproofed.

Is it possible to repair a swimming pool without draining it?

In some cases, yes: for a localized leak, there are repair techniques that can be done with the pool full, avoiding the loss of the swimming season. These techniques aren't suitable when the entire pool basin needs to be waterproofed or the entire lining replaced. We made that decision after inspecting the pool.

Budget

Request a quote for your swimming pool

Tell us where the house is located and what kind of pool you have in mind, or what's wrong with the one you already have. We'll come from Inca to see it anywhere in Mallorca and provide you with a detailed, itemized, written quote before we begin. Call us at 625 16 47 18.