At Construcciones Armalutx, we carry out IEE (formerly ITE) works in Palma and throughout Mallorca: the repairs required by the building assessment report when it receives an unfavorable result. This report is signed by a qualified technician; we repair the facade, roof, structure, and installations in a single project, with a specialist supervisor overseeing each trade.

Residential building with a light stone facade and a glazed attic

Why Armalutx for your IEE works

  1. All the shortcomings, one construction company

    Facade, roof, structure, and sanitation are usually included in the same report. We schedule repairs according to urgency, eliminating the need for the community to coordinate multiple trades.

  2. Reinforcements without another company

    Aluminosis, rusted reinforcements or rotten beams: we solve the structure, with Mecanoviga (a steel profile under the joist, filled with mortar), carbon fiber or special concretes.

  3. Old facades with artisans

    Our master stone and wood craftsmen restore facades, cornices and balconies of the island's old buildings without erasing what makes them valuable.

  4. Intended to close the case

    We execute with the license or prior communication that is required and deliver to the community technician what he needs to sign the final favorable conclusion.

IEE and ITE: what it reviews and who signs it

The report reviews three things: the building's state of conservation (foundations, structure, facades, party walls, roofs, and common water, electricity, sanitation, and rainwater drainage systems), its basic accessibility, and its energy efficiency. Elevators, gas, and electricity systems also have their own inspections, which the IEE does not replace.

The requirement changed on June 14, 2026: since then, any building in the Balearic Islands over 50 years old must submit the report and repeat it every ten years, regardless of its use. If you're looking for someone to prepare the report, you need a qualified professional, because a construction company cannot sign it. If you already have the report and it requires work, that's where we come in.

  • Buildings that are 50 years old
  • It repeats every 10 years
  • In Palma, in 2026: buildings from 1976 and 1966
  • The report is from the technician; the work is from the construction company.

What works does an unfavorable IEE usually require?

The shortcomings of apartment blocks built between 1960 and 1980 are recurring. These are the common problems and how each one is addressed.

  • Facades and party walls

    Cornices, balconies, and cladding that could fall to the street; edges of the slabs with rusted reinforcement and cracks. The area is cleaned, the reinforcement is treated, it is rebuilt with repair mortar, and it is protected. We detail this in facade rehabilitation.

  • Roofs and rooftops

    Leaks, worn-out membranes, drains without overflows, and unfinished parapets: it's the job of Waterproofing of terraces and roofs, often in conjunction with the repair of the forging.

  • Structure and foundation

    Cracks, aluminosis, corroded reinforcement, rotten wooden beams, or settlements. Diagnosis, calculations by the technician, and reinforcement as required for each case: Mecanoviga in the joists, carbon fiber reinforcement in concrete beams and pillars, or special concretes.

  • Sanitation and stormwater

    Broken downpipes, drains and collectors that carry water to the walls or the ground: they are replaced and checked before closing.

  • Accessibility

    The IEE (Building Evaluation Report) indicates whether the building allows for reasonable accessibility adjustments. The most common is... install an elevator in the community, with the construction of its hollow.

What happens when the IEE (Energy Efficiency Assessment) comes back unfavorable in Palma?

Palma's ordinance sets the steps and deadlines. In other municipalities, the city council sets its own.

  1. Unfavorable report submitted

    The works become mandatory. The City Council doesn't need to require them: the obligation arises from the report itself.

    From the presentation

  2. License or prior notification of the works

    The community has a maximum of six months to begin the permitting process with the City Council. For this, they need our budget and, if the structure is to be altered, the technical project plan.

    6 months maximum

  3. Execution

    Facade, roof, structure or installations: we do them with the granted permission and under the direction of the technician.

  4. Final conclusion favorable

    Once the work is completed, the technician signs the final favorable conclusion of the IEE (Building Inspection Report), indicating the file number used for the work and the final certificate. This fulfills the duty of conservation.

  5. If the works are not done

    The City Council gives a final deadline of three months and afterwards can impose up to three coercive fines of €1,000, €2,000 and €3,000, with another three months deadline each time.

    3 months per notice

Imminent danger

When the report detects a risk to people

If the Building Inspection Report (IEE) detects an imminent danger, such as a balcony or cornice that could collapse, urgent measures are taken before any permanent work begins: shoring up, removing loose pieces, and installing netting or fencing. In Palma, the technician in charge of the work announces that they are assuming responsibility for the project, along with appointing the construction company, and notifies everyone upon completion.

If no one takes responsibility, the City Council issues an enforcement order. These urgent measures do not replace the necessary repairs: the community remains obligated to carry out the remaining repairs outlined in the report and submit the final favorable conclusion.

  • Shoring and propping
  • Removal of loose facade elements
  • Nets, canopies and fencing
  • Then, the final works

Vehicle inspections in Palma: dates, deadlines and fines

The essentials of the procedure in the capital, at a glance.

ThatFact
Buildings requiredEveryone who turns 50, regardless of their use
How oftenEvery 10 years
2026 CalendarBuildings constructed in 1976 and second report of those from 1966
Deadline to start the building permit process if the result is unfavorable6 months maximum
Fine for not submitting the IEE€600-€1,500 per cadastral reference; €2,999 maximum for protected buildings
If it is presented with the disciplinary proceedings already openThe fine is reduced to €150
Fine under Balearic law600-3.000 €
Coercive fines if the works are not carried out€1,000, €2,000 and €3,000, with a three-month term for each
Compliance in 2024Only 21% of the required buildings submitted the report, and files were opened on 3,467.

Data valid as of October 2026 for Palma. In other municipalities, the city council sets its own schedule.

Who decides and who pays in the community

The works requested by the IEE to preserve the building are not voted on: they are mandatory.

  • Without prior agreement from the board

    The necessary works to preserve the building, including those related to safety, habitability, and universal accessibility, are mandatory. The board only decides how the special assessment is distributed and how it is paid.

  • Whoever opposes responds

    The owner who opposes or delays without reason what the Administration orders will be personally liable for the penalties.

  • The neighbors have to let it happen

    Each owner must allow in their apartment the repairs and easements essential for the common works, with the right to be compensated by the community if there is damage.

  • Aid in 2026

    Next Generation applications are no longer being accepted. The 60% deduction in Personal Income Tax (IRPF) for energy efficiency building renovations paid for by December 31, 2027, remains in effect. This requires reducing non-renewable primary energy consumption by at least 30% or achieving an A or B energy efficiency rating. Each owner can deduct up to a maximum of €5,000 annually.

Frequently asked questions about the IEE in Palma and Mallorca

Do you prepare the IEE report?

No. The IEE (Energy Efficiency Certificate) is signed by a qualified professional: in a residential building, an architect or a building engineer. We are the construction company that carries out the work specified in the report, and we work with the professional chosen by the building's residents.

Is ITE the same as IEE?

Not exactly: the IEE is the evolution of the ITE. The old inspection only looked at the state of conservation, while the IEE adds accessibility and energy efficiency. Many people still use the term ITE for both, and in practice, it refers to the same mandatory report for buildings 50 years old.

What happens if my community does not submit the IEE in Palma?

It's a planning violation. Palma's ordinance penalizes it with a fine of €600 to €1,500 per cadastral reference, with a maximum of €2,999 for protected buildings, and filing the required documentation remains mandatory. If it's filed after the proceedings have begun but before the penalty is imposed, the fine is reduced to €150. In 2024, the City Council opened proceedings against 3,467 buildings.

What happens if the IEE comes back unfavorable?

The works become mandatory. In Palma, there is a maximum of six months to apply for the license or submit the prior notification, and at the end of this period, the technician signs the final approval. If the works are not carried out, coercive fines are imposed.

Can residents vote against the IEE's projects?

No. These are mandatory maintenance works and do not require board approval: the only thing voted on is how the cost will be divided. Any owner who opposes or delays them without justification will be personally liable for the penalties, and each resident must allow essential repairs to be carried out in their apartment.

Do the IEE works require a license?

It depends on what they're doing. If they affect the load-bearing structure or the building is listed, they need a building permit with a project plan. Otherwise, prior notification is usually sufficient; in Palma, work affecting the façade or partial floor slabs requires a qualified technician and allows work to begin after 15 days.

How much do the works for an unfavorable IEE cost?

It depends on the deficiencies identified in the report, the size of the building, and whether structural work is required. With the report in hand, we'll visit the building and provide you with a breakdown of costs, one item per deficiency, so the board can decide on the allocation and order of the work.

Budget

Does your building have an unfavorable IEE rating?